Home       About Us       Boats       Emulsions       Contacts
 

EMULSION RANGE

Cutback Bitumen MC 70

The cutback bitumen is homogeneous and will not foam (as observed visually) when heated to application temperature. The various grades of cutback bitumen (medium curing type) conform to requirements prescribed below :

MS 159 : 1994
Specification for cutback Bitumen for use in the Construction And / or maintenance of Pavement
(First Revision)

REQUIREMENTS FOR CUTBACK BITUMEN (MEDIUM-CURING TYPE) FOR USE IN PAVEMENT CONSTRUCTION AND / OR MAINTENANCE

 Properties
Min
Max
Test Method
 Kinemalic 1 viscosity at 60°C, eSt
70
140
ASTM D2170
 Flash Point (Tag Open-Cup),°C
38
-
ASTM D1310
 Distillate test 2 :      
 Distillate, percent by Volume of total 360°C
 To 190°C
-
10
ASTM D402
 To 225°C
20
55
ASTM D402
 To 260°C
40
80
ASTM D402
 To 316°C
75
95
ASTM D402
 Residue from distillation to 360°C,  percent volume by different
 Test on residue from distillation Penetration at
25°C,100g, 5 sec.
55
-
 Ductility 3 at 25°C, cm
120
250
ASTM D402 / ASTM D113
 Solubility in trichloroethylene, percent mass
100
-
ASTM D402 / ASTM D2024
 Water, percent volume
-
0.2
ASTM D95

USES
Priming of all non-bituminous road buses, provision of temporary surfaces (deviations).

APPLICATION RATE
From 0.6 litre per m² to 1.2 litre per m²

SPRAYING/ALICATION TEMPERATURE
60-80˚ C

CONVERSION

 At Application Temperature  Drums@20˚C
 Kg to Litre : Divide by 0.0907   Kg to Litre 0.940
 Litre to Kg : Multiply by 0.0907   Litre to Kg 0.940

CLEANING OF HANDS & TOOLS
Use paraffin

 

 

 

2013 Copyrights Demo United Enterprise